Gansu Qingyang Oilfield Fracturing Machine 4*1.725MW Project

Location: Qingyang, Gansu


Equipment: Four sets of 1725KW integrated cabins


Description:

This project is composed of four sets of 1725KW integrated cabin AC and parallel generators, specially designed for the field oil field operating environment. The integrated cabin can be transported as a whole cabin as the project changes. It has the black start function of multiple off-grid parallel machines to meet the particularity of the field oil field operating environment. When the power grid cannot cover or fails, the integrated cabin can operate independently to provide stable power supply to the oil field. During grid-connected operation, the transformer capacity expansion and system peak shaving functions are realized to ensure the stable operation of the load and the continuity of power supply.